Sunday, January 9, 2011

Free Episodes Of Bang Bros

News from our future "madness": The Barn

It began with the destruction of the shed, the walls arrasage it and transforming this place into a large terrace.





Having broken and cleared all the old flooring is the usual routine with the creation of slits in the walls, the positioning of the beams and slab laying (with concrete above, it will become the slab).




Terrace (former penthouse) serves as a junction point between workers coming to refuel (here, the concrete produced in the bucket to the slabs) and deposition of materials. the latter being led by a special device whose arm can stretch to 6 feet.




The old wall of the former West Terrace is razed to make from a corner post two large bays.





To bring electricity from the small path behind, he of course had to make the trench with a shovel (no question of sending the smallest backhoe).





Now we must break through the wall of 70cm to get the electric cable and install the meter.





Here are 2 large bays (one of 3 m to see Mount Brion) and the other 2 m leading to a small terrace and a staircase) under construction.





The same two large bays in the living room seen from outside the west side.





The great wall separating the old terrace of the room with the mullioned window is shot, which will create a large room including the cathedral entrance, kitchen (a mezzanine above the kitchen) and a large living room lit by two large bays





The central pillar of the great room is finished (it Its role is to support the large horizontal beam that supports the entire roof on this side and help build the mezzanine) and the roof framing is almost finished (it only remains to put the rafters and lay the PZT plates then the tiles).





The volume of the great room cathedral began to appear.





The electric meter is installed. Now, remove the old stone floor and try to increase the height of the room by digging. Unfortunately, they will fall very quickly on a granite slab, so that this piece (tile fact) will be low ceiling (2m20), it will be a bedroom (that of Blaise).





The rain keeps falling. So instead of climbing the roof of "the other side of the ridge", we advance the work that can be "dry" Here, the coating of the large living room.





hard to recognize this piece with the panel made its old bite door (which will become the future chamber Blaise).




partitions are being mounted to structure a toilet, a storeroom, the Board of Blaise and his bathroom.

0 comments:

Post a Comment